Blog

GARIC – Manchester – Short lead time met.

23rd May 2016

Sixteen buildings were recently supplied to GARIC at a site in Manchester.
Ground floor consisted of welfare facilities, canteen, changing rooms, toilets, shower & kitchen areas.

The upper floor houses offices with a small kitchenette.

This was delivered within a very short lead time due to time constraints imposed by their client.

&nbsp

Callback Request Request
Callback
x