Blog

Jones Skips – Wolverhampton (Second floor)

10th April 2018

A three bay modular building was delivered and installed in April 2016.

Expansion within the company meant more space was required.

A second floor, two bay building with external steel stairs has now been added.

 

Callback Request Request
Callback
x