Blog

March 2015

11th March 2015

Once again we have been keeping busy with both new and used buildings, and spring is in the air!

Sims Milling in Hampshire took delivery of a two story building on 2nd March – eight on the ground floor and a four bay first floor with internal stairs, offices, toilet, showers & kitchen areas. The order was placed with a strict two week lead time as the existing offices were to be demolished and replaced with this new building.

Redcar Developments in Manchester took delivery of a six bay building which they will fitt out themselves as a changing / shower / reception area for Prestwich Heys Football Club.

Henry Bros – Hounslow received a new 20′ x 8′ unit (two gents and one ladies toilet block)

Brooksby Melton Collage – Melton Mowbray took delivery of a new 20′ x 8′ unit.

JCK from the Isle of Man now have a new 20′ x 8′ office unit.

Galliford Try Infrastructure arranged for delivery of new buildings to Marchwood, Southampton for onward shipping to the Falkland Island.

HB Hydraulic Engineering at Rosyth Royal Dockyard have taken delivery of a second building – the first was a six on six two story building, this latest is a four bay single story.

Alton Towers have taken a single 20′ x 8′ to use as another Green Room.

Medavia in Malta collected four buildings for onward shipping

P C Howard transport took a single 20′ x 8′ office at their Corby depot.

Hyndburn Borough Council in Accrington now have a new three bay office.

Trafalgar Wharf in Portsmouth took delivery of their fourth order of a five bay office.

Lafarge Tarmac have a five bay office at Cauldon Lowe Quarry.

Shemara Refit in Southampton have an eight on eight two story building with two sets of exterior stairs at their boat refit depot.

SBS Construction in Balham took a single 20′ x 8′ unit with an extra window

Jamie Wood in Alnwick took a new 20′ x 8′ with kitchen & toilet to go outside his lambing shed

Boud Minerals in Sutton Bridge collected a one bay extension for their existing building

The Ex-Police Car Centre in The West Midlands took delivery of an office split into two.

Robert Smith from Newton Stewart collected a single 20′ x 8′

Mr A Cullen from Billericay in Essex collected a single 20′ x 8′ unit

Three Counties Show Ground in Malvern have taken delivery of six 24′ x 9′ jack leg cabins to be used as accommodation for seasonal workers.

 

 

 

Callback Request Request
Callback
x