Telec Utilities have opened an new depot near Ipswich and needed their existing offices and storage moved.
We originally installed the buildings at their Grimsby site as two separate building a twelve bay in June 2016 and five bay in September 2016.
An office is still needed at the Grimsby site so the remaining buildings have been re-located and re-configured to provide a twelve bay ground floor with a four bay office / meeting room on top.
The move took place over a week.