It seems a little late as we near the end of January to wish everyone a happy new year! We hope the coming year brings you all you wish.
December was a short month for us as we closed for our Christmas break on Friday 18th, but we were busy right up to the last day ….
D&W Autos in Winsford Cheshire, took a single 20′ x 8′ building with extra window.
Altrad NSG in Manchester had a three bay building with main office, private office, lobby, kitchen and toilets fitted.
Costain in Glasgow took another two bay building
Gregory Distributions depot in Haverfordwest had a 20′ x 8′ extension to one of their existing offices.
Walter Watson in County Down collected a two story three on three building with office, lobby & toilets on the ground floor and offices on the first floor.
Wotmix in Hyde, Cheshire collected a four bay building consisting of three 20′ x 8′ units and one 10′ x 8′.
Severfield in Enniskillen collected a three bay building with offices with full length fixed windows, toilets & kitchen fitted.
Turners Coachways in Bristol took delivery of two separate 20′ x 8′ units, on standard as an office and one with extra windows, kitchenette and toilet for use as a security lodge.
January has been extremely mild, and we have luckily escaped the heavy snows that have hampered us in previous years.
We started the year by installing a two bay building for Barford parish Council in Warwickshire
Response Engineering in Cheddar took delivery of a two bay building to go on top of the building delivered about 18 months ago.
Natural Paving in Doncaster have a new four bay building with entrance lobby, two toilets and meeting room.
Henry Construction have seven single 20′ x 8′ units in a site in Hayes for use as various offices for themselves and their client along with a toilet block.
Woodford Pipeline in Rochdale ordered and took delivery of a single 20′ x 8′ unit within a week.
Hinton Skips in Croydon also took delivery of a single building within a week of order, this was fitted with an internal partition with sliding window and kitchenette.
Giraffe Access in Bristol had a building delivered to their Grantham site last year, this was collected and delivered to Bristol along with a new office unit to stack.
Oldwalls Gower in Swansea have taken delivery of a three bay building consisting of two 20′ x 8′ units and one 10′ x 8′ unit.
Greener 4 Life Energy / Willowglen Renewable in Exeter have taken delivery of two single 20′ x 8′ units – one office with toilet and one with shower, changing area and canteen.
Central Build – Waltham Abbey have a new four bay 40′ x 16′ unit with central column