Blog

  • Eight bay modular building – offices, canteen, toilets and internal stairs

    27th April 2021

    Read More Cheadle Skips in Stockport have just taken delivery of their new offices. (more…)]
  • Crane vehicle delivery

    22nd April 2021

    Read More We normally make deliveries of our portable buildings and modular buildings using vehicle mounted cranes. (more…)]
  • 10′ x 8′ Units multiple uses

    19th April 2021

    Read More We currently have stocks of 10' x 8' (3mtr x 2.5mtr) buildings which can be put to a multiple of uses. (more…)]
  • Roll On Roll Off Collection

    26th March 2021

    Read More BFG Groundwork's collected their new site office with their hook loader - an innovative idea on how to load and unload without the use of a crane / hi-ab  
  • Toilet blocks for social distancing in the workplace.

    9th February 2021

    Read More We've been supplying more and more toilet blocks for the workplace. Social distancing is very important at the moment and will remain to be so for some time to come. (more…)]
  • 30 Bay Building for Wm Morrison’s in Turriff

    22nd December 2020

    Read More We were contacted by Malcolm in the middle of October to discuss options for a new socially distanced canteen for their staff at Woodhead's site in Turriff. (more…)]
  • Over 100 units in stock

    30th November 2020

    Read More We are currently holding over 100 units in stock with a further 100 expected before the Christmas break. This puts us in a strong position to fulfill your portable / modular building needs. Why not call us on 01298 797530 to discuss your requirements.  
  • Andrew Care Limited – Care Home visitor rooms

    20th November 2020

    Read More Craig contacted us to discuss supplying visitor rooms to his three care homes as the residents were having to see their loved ones outside and the Peak District weather is changeable at best. A design was agreed with a door at either end and two windows to maximize light, Craig will install a solid, clear panel in the middle of the building to allow the resident and their family member to see and speak to each other with no risk. They were delivered to all three care homes on the same day. We've just received some more images of the visitor pods now they have their decals
Callback Request Request
Callback
x